Home › Colombia › Medellín › New developments

What new developments are coming to Medellín?

We analyzed 104 sources and 352 signals · Updated Nov 16, 2026

Get a free answer from 2,000+ pros in ColombiaMessage ›

Summary

A lot, mostly in the towns around the city. Zonario lists 118 housing projects on sale in Medellín, 43 in Envigado, 49 in Sabaneta and 65 in Rionegro, as of 17 October 2026.

Inside Medellín, land is scarce in the popular areas. El Poblado gets small luxury buildings, Laureles mid-size towers that replace old houses, and Calasanz new towers along the future Metro de la 80. Belén and Las Palmas have only a couple of projects each.

New flats cost more than resale. Across all listings in Medellín, new flats ask about 16% more per m² than flats a year old or more, Aptología found in November 2026.

Most projects are due between 2027 and 2029. Developers publish a stage for few of them, so check how far each one has got.

Sales have slowed. New-home sales in Antioquia fell 18.5% in the first half of 2026, after a strong 2025. That gives buyers room to negotiate, and makes the developer's track record matter more.

If you want new, the towns offer the most choice and the lowest prices per m². In Medellín itself, look at what is already built before you pay for a plan.

Our Medellín new developments table by area

Our table gives Medellín and 9 areas a verdict on how many projects are on sale, then the count, the starting prices of the projects named, an example, the typical delivery year and the main developers.

The rule behind each verdict is written under the table. The first line is Medellín as a whole.

If you want real answers from the field about a specific home or street, ask a pro in Medellín for free.

Prices in US$ · 9 neighborhoodsSwipe for more columns →
Neighborhood
 
 
New projects
our short answer
 
Projects on Sale
pre-sale or
being built
Starting Price
of the
projects named
Example Project
on sale now
 
Typical Delivery
year
 
Main Developers
names
 
Why
what drives
the verdict here
Data
confidence
 iHigh: direct data for this neighborhood. Medium: one strong source, or several pointing the same way, with our own estimate. Low: few signals, an order of magnitude.
MedellínChecked Nov 2026 Many 118 projects US$330K average — Mostly 2027-2029 Conaltura, Arquitectura y Concreto, Conconcreto, Coninsa Zonario lists 118 projects by 58 developers in Medellín, average 84.6 m² and COP 11.9M per m² asking (17 Oct 2026). Across all listings, new flats ask about 16% more per m² than resale (Aptología, 14 Nov 2026). Medium
El Poblado Some 5+ projects From US$671K Treebal Los Balsos, 39 flats 2026-2027 Conconcreto (Treebal), Oblicuo, Contree Small luxury buildings on scarce land: Treebal Los Balsos (39 flats from COP 2.17bn), Oblicuo's Carboneros and Al Parque. Medium
Laureles Some 6+ projects — Esférica, Vigo, Distrito 33 2027-2028 Esférica, Vigo, Distrito 33 Mid‑size towers replacing old houses. About 80% of buyers in one project, Esférica's, buy to rent out. Medium
Calasanz Some 3 projects From US$100K Zinia, tower 4 Not published Arquitectura y Concreto Zinia's fourth tower, 2-bed flats of 48 m² from COP 323.5M, plus Faroverde and Reserva Serrat, all along the future Metro de la 80. Medium
Belén Few 2 projects From US$232K Atrium 2027-2028 Atrium, Colonia Two mid‑to‑upper projects. Atrium asks for 30% in 36 instalments during construction, the usual pre‑sale plan here. Medium
Las Palmas Few 1-2 projects From US$316K Tres Cantos, tower 3 H1 2027 Conintel Hillside towers with views on the road to the airport: Tres Cantos tower 3, delivery in the first half of 2027. Medium
Envigado Many 43 projects US$155-249K Antalá, Verde Olivo, Civita 2027-2029 Conaltura (Polanco), San Remo, EME A big pipeline for a town: 43 projects on sale, such as Antalá (2029), Verde Olivo and Civita (2028) and Artesia (2027). Medium
Sabaneta Many 49 projects US$82-195K Nature Aqua, 6 towers of 30 floors 2027-2028 Conconcreto (Menta), Constructora Capital, Conhogar Big tower blocks: Nature Aqua (six 30-floor towers), Natura Hills (four towers of 132 flats), Menta (155 flats). Prices from COP 265-630M. Medium
Rionegro Many 65 projects US$129-214K Valle Rosa, Sky Tower, Miit 2027-2028 Conintel (Riomanso), Valle Rosa, Sky Tower The largest pipeline outside the city itself, 65 projects, while new‑home sales in Antioquia fell 18.5% in the first half of 2026. Valle Rosa, Sky Tower, Miit. Medium
Llanogrande — Several projects US$227-237K Portanova apartasuites 2027 Coninsa (Portanova), Oblicuo Not rated: no count of projects on sale is published here. Portanova apartasuites near the airport from COP 736-768M for 64 m², sold for short stays. Oblicuo's Madre Selva (36 homes, 2027). Low

New-home sales in Antioquia fell 18.5% in the first half of 2026, from 10,368 to 8,551 (El Tiempo, from industry figures). Medellín and the Oriente each sold about 1,370 non-VIS homes from January to August (El Colombiano). Rule, on projects on sale: Few = 2 or less, Some = 3 to 39, Many = 40 or more. Not rated where no count is published.

How we got these numbers. We analyzed 104 sources and 352 signals on Medellín, including Camacol Antioquia, La Lonja, Zonario, Aptología new-vs-resale listings and 15 developer pages. The table itself uses 18 signals from 12 sources. Counts are listings on sale, not launches.

Source: TheLatinvestor property database, November 2026.

Example conversation
350+ pros in Medellín
Buying off‑plan?
Ask a Medellín pro to check
the developer, for free.

They know which developers deliver on time.

Message a pro

What new developments are coming to Medellín?

Mostly mid-size apartment towers, many of them in Envigado, Sabaneta and Rionegro.

Zonario, a portal of new-home projects, counted on 17 October 2026: 118 projects on sale in Medellín by 58 developers, 43 in Envigado, 49 in Sabaneta and 65 in Rionegro. All four read Many on our rule, 40 projects or more.

Inside Medellín, El Poblado, Laureles and Calasanz read Some, with 3 to 39 projects each. Belén and Las Palmas read Few.

The main developers include Conaltura, Arquitectura y Concreto, Conconcreto and Coninsa.

How far along are these projects?

For most, the portal does not say. Of Medellín's 118 projects, Zonario shows 2 ready to move into, 13 under construction and 17 still on plans. It gives no stage for the other 86.

Most projects in our table are due between 2027 and 2029. A project on plans can take three years or more to deliver, and some take much longer.

Before you pay a deposit, ask whether the project has reached its sales target and started building. Our pre-construction page lists the risks.

Where is most of the building?

In the towns around Medellín, where land is cheaper.

Outside the city itself, Rionegro has the most projects in our table, 65 by 48 developers. Sabaneta has 49 and Envigado 43.

El Tiempo reported in August 2026 that developers plan to start building homes over the next two years mostly in Bello (7,312), Medellín (7,290), Rionegro (3,417), Sabaneta (3,392) and La Estrella (3,110).

Inside Medellín, building concentrates where there is land. In 2025, the most new homes were sold in El Poblado (1,915), Buenos Aires (1,141) and Robledo (1,016), according to La Lonja.

What do new flats cost?

More than resale, and the gap depends on the source.

Aptología, which reads all listings, found new flats in Medellín asking about COP 8.69M per m² in November 2026, against COP 7.52M for flats a year old or more, about 16% more.

Zonario's project averages are higher: COP 11.9M per m² and about COP 1,067M per home in Medellín, for an average 84.6 m². That figure covers developers' own projects, many of them upscale, so it reads high.

In the towns, Zonario's averages are lower: about COP 8.1M per m² in Sabaneta and COP 8.6M in Rionegro, for homes of about 70 m². Envigado is close to Medellín at about COP 11.9M per m².

350+ pros in Medellín
Not sure where to buy?
Ask a local agent
in Medellín, for free.

They know every neighborhood, street by street.

Message a pro
Example conversation

What is being built in El Poblado?

Small, expensive buildings on scarce land.

Treebal Los Balsos, by Conconcreto, has 39 flats from about COP 2.17bn each. Oblicuo is building Carboneros and Al Parque, and Contree is among the other developers.

El Poblado reads Some on our rule, with at least 5 projects on sale. Most new supply there is luxury. A buyer looking for a mid-priced new flat in El Poblado will find little.

What about Laureles and Calasanz?

Both get mid-size towers, and Calasanz the new metro line.

In Laureles, towers replace old houses. Projects include Esférica, Vigo and Distrito 33, due in 2027 and 2028. The developer Esférica said about 80% of its buyers there buy to rent out.

In Calasanz, Arquitectura y Concreto sells the fourth tower of Zinia, at Altos de Calasanz: 2-bed flats of 48 m² from COP 323.5M. Faroverde and Reserva Serrat are also on sale, along the route of the Metro de la 80.

Why are there so few projects in Belén and Las Palmas?

Little land in Belén's built-up streets, and steep, costly land in Las Palmas.

Belén has two projects in our table, Atrium and Colonia. Atrium starts at about COP 750.6M and asks for 30% of the price in 36 monthly instalments during construction.

Las Palmas, on the hillside road to the airport, has one or two, such as Tres Cantos, whose third tower starts at about COP 1.02bn and is due in the first half of 2027.

Llanogrande, near the airport, has projects such as Portanova's apartasuites and Oblicuo's Madre Selva, but no count of projects is published there, so we do not rate it.

Are sales keeping up with all this building?

Not in 2026. New-home sales in Antioquia fell 18.5% in the first half of 2026, from 10,368 to 8,551, El Tiempo reported.

That follows a strong 2025. La Lonja counted 6,371 new homes sold in Medellín in 2025, up 56% on 2024, and 17,350 in the Valle de Aburrá, up 44%.

Slower sales give buyers room to negotiate and pick finished units. They also mean some projects will take longer to reach the sales needed to start building.

Example conversation
350+ pros in Medellín
Is it a good deal?
Ask an agent who knows
Medellín, for free.

They know what similar homes really sold for.

Message a pro

Will the new zoning plan change where developers build?

Over time, probably toward transit. The zoning plan revision approved in November 2026, with 757 articles, aims to bring housing closer to public transport.

It ties parking and building rights to each area, and adds incentives for social and priority housing, the city said. It gives no figure for how many homes it will add near transit.

The Metro de la 80 corridor, with Calasanz, Belén and La América, is the obvious candidate. Projects there are already marketed on the line.

So, what new developments are coming to Medellín?

Many projects, mostly mid-size towers due in 2027-2029: 118 on sale in Medellín, 43 in Envigado, 49 in Sabaneta and 65 in Rionegro.

Inside the city, El Poblado gets small luxury buildings, Laureles towers that replace houses, and Calasanz new towers on the future metro line. Belén and Las Palmas get few.

New flats ask about 16% more per m² than resale, and sales slowed in 2026. Choose a developer with delivered projects, and compare with resale flats nearby.

Our methodology

Our data runs through November 2026. We rate Medellín and 9 areas on how many housing projects are on sale, with a written rule: 2 or fewer is Few, 3 to 39 is Some, 40 or more is Many.

Project counts and averages for Medellín, Envigado, Sabaneta and Rionegro come from Zonario (17 October 2026). Counts inside Medellín come from a partial list of projects, so they are minimums. Starting prices are those of the projects named, from developers' pages, in dollars at COP 3,237.83 per US$. New-against-resale prices come from Aptología (14 November 2026).

Counts are projects on sale, not launches or homes. Llanogrande has no published count and is not rated. This is general information built from public data, not personal financial advice.

Key sources used for this analysis include Zonario, 17 October 2026: 118 projects in Medellín by 58 developers, average 84.6 m², COP 11.9M per m², stages, Zonario, 17 October 2026: 43 projects in Envigado, COP 11.9M per m², Zonario, 17 October 2026: 49 projects in Sabaneta, COP 8.1M per m², 70.6 m², Zonario, 17 October 2026: 65 projects in Rionegro by 48 developers, COP 8.6M per m², Aptología, 14 November 2026: new flats COP 8.69M per m² against COP 7.52M for resale, Arquitectura y Concreto: Zinia, Altos de Calasanz, tower 4 from COP 323.5M, 48 m², Atrium, Belén: prices and payment plan, Conconcreto, May 2026: Treebal project, Oblicuo: Madre Selva, 36 homes, El Tiempo, 4 August 2026: Antioquia sales down 18.5%, planned starts by municipality, La Lonja, 2 February 2026: 6,371 new homes sold in Medellín in 2025, top sectors, El Colombiano, 23 October 2026: Esférica buyers in Laureles, Medellín and Oriente sales and City of Medellín, 11 November 2026: zoning plan revision, 757 articles, housing near transit.

Spotted an error? Tell us, we fix it within days.

In this article