Summary

Some risk, mostly delay. More than 8 in 10 new flats in Lima are sold on plans or while being built, so buying off-plan is normal here. But in a 2025 survey of 1,299 Lima buyers, only 48.5% got the keys on the promised date.

Most delays are short. Another 39.1% got their flat "within a reasonable time" after the date, and 12.4% late.

Stalled projects happen in central Lima too. In 2026, buyers in at least five Capac Asociados projects in Miraflores, Surquillo and Jesús María found the works stopped, and Indecopi rulings in their favour went unpaid.

Defects are common. In the same survey, 69% of buyers noted something to fix at handover.

The worst cases we found are land plots, not flats. Indecopi froze the accounts of Aybar's two firms over 277 complaints about lots allegedly sold without clean title, mostly outside Lima.

Your protections are simple and work: the land title at SUNARP in the developer's name, the developer's record at Indecopi, and paying into the account of the bank that finances the project.

Our Lima pre‑construction risk table

Our table rates eight risks of buying a flat off-plan in Lima, from late delivery to plots sold without papers.

For each one it shows how common it is, a recent example with its source, what protects you by law or in practice and what to check before you pay, with the reason for each verdict and our confidence.

If you want real answers from the field about a specific home or street, ask a pro in Lima for free.

8 types of riskSwipe for more columns →
Type of risk
 
 
Risky to buy off-plan?
our short answer
 
How Common
in Lima
 
Recent Example
with the source
 
What Protects You
by law or
in practice
What to Check
before paying
 
Why
what drives
the verdict here
Data
confidence
 iHigh: direct data for this type of risk. Medium: one strong source, or several pointing the same way, with our own estimate. Low: few signals, an order of magnitude.
Late delivery Some risk About half got the keys on the promised date 48.5% on time, 39.1% 'within a reasonable time', 12.4% late (Best Place to Live survey of 1,299 buyers in 33 Lima projects (Gestión, May 2025)) You can ask for your money back if the contract date passes (Indecopi) A penalty per month of delay written into the contract The most common problem: in a 2025 survey of 1,299 Lima buyers, 48.5% got the keys on the promised date, 39.1% 'within a reasonable time' after it and 12.4% late. Write a monthly penalty for delay into the contract. Medium
Very late or never built Some risk Uncommon, but a 2026 case hit central Lima Capac Asociados: works stalled in Miraflores, Surquillo and Jesús María; Indecopi ruled for buyers, rulings unpaid (El Comercio, Mar 2026) Indecopi complaint, refund orders, fines Title of the land in the developer's name at SUNARP Not rare enough to ignore: in 2026, buyers in at least five Capac Asociados projects in Miraflores, Surquillo and Jesús María found the works stalled, and Indecopi rulings in their favour went unpaid. Check the land title at SUNARP and which bank finances the project. Medium
Developer sanctioned Some risk 269 Indecopi sanctions on builders and developers in Peru, Jan‑Jun 2026 Indecopi: 269 sanctions in 2026 to June, mostly for not delivering what was offered (El Peruano, Jun 2026); the developers' own office (DCI) took 132 claims in 2025 Indecopi fines and public list Search the developer on Indecopi's sanctions list Indecopi sanctioned builders and developers 269 times across Peru in the first half of 2026, mostly for not delivering what they offered. Its public register ('Mira a quién le compras') shows a developer's record before you sign. Medium
Defects at handover Some risk 69% of buyers noted defects at handover (2025 survey) Residencial Alfa Aguilar, Surquillo: Indecopi ordered a refund for defects Indecopi; the developer must fix hidden defects Visit a finished building by the same developer In a 2025 survey, 69% of buyers noted something to fix at handover, and after‑sale defects were 41% of the claims the developers' own complaint office took in 2025. Indecopi can order repairs or a refund. Visit a finished building by the same developer. Medium
Deposit not refunded Some risk Refund requests were 18% of the claims to the developers' office in 2025 Indecopi guide lists refused refunds of deposits and down payments Indecopi complaint Get the refund terms for the reservation fee in writing Reservation fees and down payments that never come back are a classic Indecopi case. Get the refund terms in writing before you pay anything. Low
Smaller or different flat Low risk Units are shrinking by design New flats sold in 2026 average 64.3 m², against 66.1 m² in 2025 (CODIP) The developer must deliver what the contract and plans say Areas and finishes listed in the contract annex New flats are getting smaller on purpose (64.3 m² on average in 2026), not by trickery. The risk is low if the areas and finishes are listed in the contract. Medium
Land plots sold without papers Some risk Mainly outside central Lima Aybar: Indecopi froze the firms' accounts over 277 complaints about lots without clean title or not delivered (Gestión, Feb 2026) Indecopi precautionary measures Buy flats with a SUNARP‑registered project, avoid plots sold on possession papers The worst cases we found are plots, not flats: Indecopi is investigating 277 complaints against Aybar over lots allegedly sold without clean title or not delivered, and froze its accounts. It has not ruled yet. Buy flats in a SUNARP‑registered project. Medium
Paying with no bank behind it Some risk Depends on the project Most sales are off‑plan: 34% bought on plans and 47% under construction in early 2026 (CODIP) Your bank only lends on a future home (bien futuro) in a project it has reviewed Ask which bank finances the project and pay into its account More than 8 in 10 new homes are sold on plans or while being built. A project financed by a bank, with your money paid into its account, is the safer route. Medium

Your best protection: the land title at SUNARP in the developer's name, the developer's record at Indecopi, and paying into the account of the bank that finances the project. Rule (ours), risk by risk: High risk = a recent local case where buyers lost the home or the plot; Some risk = a recent case that ended in sanctions or refund orders, or a common practice that leaves your money unprotected; Low risk = something the contract can fix.

How we got these numbers. We analyzed 80 sources and 361 signals on Lima (BCRP district price series, Urbania and Aptología portal studies, CODIP and CAPECO developer data, AirROI, Airbtics, AirDNA and TuLugar, INEI, SIDPOL police data, SAT and the municipalities, press and residents' forums). The table itself uses 15 signals from 7 sources. Rows are types of risk, because the data exists for Lima as a whole, not by district: Indecopi sanctions and decisions, the developers' own complaint office (DCI: 132 claims in 2025 against 212 member firms), a buyer satisfaction survey, CODIP and press cases.

Source: TheLatinvestor property database, November 2026.

Example conversation
430+ pros in Lima
Buying off‑plan?
Ask a Lima pro to check
the developer, for free.

They know which developers deliver on time.

Message a pro

Is it risky to buy pre-construction in Lima now?

Some risk, mostly delay. Seven of the eight risks in our table rate Some risk, and one, a smaller flat than expected, rates Low.

None rates High. Our rule keeps High for a recent local case where buyers lost the home or the plot, and we found complaints and investigations, not a final loss.

Off-plan is how most Lima flats are sold. CODIP found 34% of buyers bought on plans and 47% while the building was under construction in early 2026 (RPP, April 2026).

So the question is less whether to buy off-plan than how. The same few checks avoid most problems.

How often are off-plan flats late?

Often, but usually not by much. In Best Place to Live's survey of 1,299 buyers in 33 Lima projects, 48.5% got the keys on the promised date (Gestión, May 2025).

Another 39.1% got them "within a reasonable time" after it, and 12.4% late.

You can ask for your money back if the contract date passes, and Indecopi can order it. But a refund months later does not pay your rent in the meantime.

Write a penalty for each month of delay into the contract.

Can a project stop halfway?

Yes, and in 2026 it happened in central Lima. El Comercio reported in March 2026 that buyers in several Capac Asociados projects found the works stalled: Lune in Jesús María, Celeste 161 in Surquillo, and Hype, Inclán 383 and Teruel 275 in Miraflores.

Two more projects, in Miraflores and Chorrillos, had not started. Some finished flats were still not registered separately, so buyers could not put them in their name.

Buyers who went to Indecopi won in first and second instance, with orders to cover their rent, but the company had not paid, according to El Comercio. Indecopi lists 16 sanctions against it.

This is the risk the checks exist for: a developer short of cash, with no bank watching the project's money.

Does a bank behind the project make it safer?

Yes, it is the best protection you can get. When a bank finances the building, buyers' payments usually go into a project account the bank watches.

Ask which bank finances the project, and pay into that bank's project account, not to the developer's general account.

Your own bank will only lend on a future home (bien futuro) in a project it has reviewed. If no bank will lend on a project, take that as a warning.

430+ pros in Lima
Is the title clean?
Ask a Lima lawyer
today, for free.

They check the registry before you pay anything.

Message a pro
Example conversation

How do you check a developer?

Three checks, all public.

First, the land. Ask for a SUNARP property certificate (certificado registral inmobiliario) showing the plot in the developer's name, with no charges you were not told about.

Second, the record. Indecopi sanctioned builders and developers 269 times across Peru in the first half of 2026, mostly for not delivering what they offered (El Peruano, June 2026). Its public register, "Mira a quién le compras", shows each firm's sanctions.

Third, the buildings. Visit a finished building by the same developer and talk to the owners.

Can you lose the reservation deposit?

Sometimes. Reservation fees and down payments that never come back are a classic case at Indecopi.

Refund requests made up 18% of the 132 claims the developers' own complaint office, the DCI, received in 2025 (Gestión, March 2026).

Before you pay a reservation fee, get in writing when it is refunded, how and within how many days, including when the bank turns down your loan.

How common are defects at handover?

Very. In the 2025 survey, 69% of buyers noted something to fix when they got the keys (Gestión, May 2025).

After-sale defects were also the largest share of claims to the DCI in 2025, 41%, ahead of contract disputes such as size or delay, 33%.

Most are cracks, leaks and unfinished details that the developer fixes. Indecopi can order repairs or a refund for hidden defects.

Go to the handover with a list, or with someone who knows buildings. Sign the handover record only with every defect written on it.

Will the flat be smaller than promised?

Rarely by trickery. New flats are getting smaller on purpose: those sold in 2026 average 64.3 m², against 66.1 m² in 2025 (CODIP via Forbes Perú).

The risk is low if the contract lists the area of each room and the finishes in an annex, with the plans. The developer must deliver what the contract and plans say.

Check whether the area includes the balcony and the walls. Two flats of "70 m²" can differ by several square metres you can actually use.

Example conversation
430+ pros in Lima
Want a second opinion?
Ask a Lima agent
for free, before you sign.

They can visit and tell you what they see.

Message a pro

Are land plots riskier than flats?

Yes, much riskier. The largest case we found is about plots.

Indecopi received 277 complaints against Aybar Corp and Aybar Investments over lots allegedly sold without clean title or not delivered on time, in projects in Lima province, Huaral, Ica and San Martín (Gestión, February 2026). It froze the firms' bank accounts and suspended demands for unpaid balances while it investigates. It has not ruled yet.

Plots sold on possession papers, without a SUNARP title, are the usual trap. A flat in a registered project in central Lima is a different, safer purchase.

What should a foreign buyer check before paying?

Five things, before any money leaves your account.

1) SUNARP: the land title in the developer's name.

2) Indecopi: the developer's sanctions on "Mira a quién le compras".

3) The bank: which one finances the project, and its project account for your payments.

4) The contract: delivery date, monthly penalty for delay, areas and finishes in an annex, refund terms for the reservation fee.

5) A finished building by the same developer, visited in person or by someone you trust.

A local lawyer who does this every week costs little next to the price of a flat.

So, is it risky to buy pre-construction in Lima now?

Some risk, mostly delay. About half of buyers get the keys after the promised date, and most defects are fixable.

Stalled projects do happen, even in Miraflores, as Capac Asociados' buyers found in 2026. The worst cases are plots sold without clean title, mostly outside the city.

Off-plan is the normal way to buy new in Lima. Buy from a developer with a bank behind the project and finished buildings you can visit, check the title at SUNARP, and put the date and the penalty in the contract.

Our methodology

Our data runs through November 2026. We rate eight risks of buying a flat off-plan in Lima.

We analyzed 80 sources and 361 signals on Lima, including Indecopi, the developers' complaint office (DCI), developers' data (CODIP), a buyer satisfaction survey, SUNARP and the Peruvian press. The table itself uses 15 signals from 7 sources.

The table's rows are types of risk, because the figures exist for Lima as a whole, not by district: Indecopi sanctions and precautionary measures, the DCI's 2025 claims (132, against 212 member firms), Best Place to Live's 2025 survey of 1,299 buyers in 33 projects, CODIP's sales data and press reports of specific cases.

Our verdict rule, risk by risk: High risk when a recent local case left buyers without the home or the plot. Some risk when a recent case ended in sanctions or refund orders, or when a common practice leaves your money unprotected. Low risk when the contract can fix it.

Cases under investigation are described in the words of the source. We name companies, not individuals. This is general information built from public data, not personal financial advice.

Key sources used for this analysis include Gestión, May 2025: Best Place to Live survey of 1,299 buyers, 48.5% on time, 39.1% within a reasonable time, 12.4% late, 69% noted defects, El Comercio, March 2026: Capac Asociados projects stalled or not started, Indecopi rulings unpaid, 16 sanctions, Gestión, February 2026: Indecopi precautionary measures against Aybar Corp and Aybar Investments, 277 complaints, El Peruano, June 2026: 269 Indecopi sanctions in construction and real estate in 2026, Gestión, March 2026: DCI received 132 claims in 2025, 212 member firms, 41% defects, 33% contract, 18% refunds, CODIP via RPP, April 2026: 34% bought on plans, 47% under construction, CODIP via Forbes Perú: new homes sold in 2026 average 64.3 m², 66.1 m² in 2025, Defensoría del Cliente Inmobiliario: how to file a claim, SUNARP: property certificate showing owner and charges, Indecopi: guide to consumer rights in property contracts, Indecopi: refund ordered for defects, including Surquillo and Indecopi: consumer protection guidelines on off-plan contracts and refunds.

Spotted an error? Tell us, we fix it within days.